Name of the Project: Feasibility Study, Survey and Design, Cost estimate of Gaushala Municipality -5 Waste water management project
Country: Nepal Location within Country: Province 2Working Period: July 2018 to October 2018
Name of the Client (Client's references): Gaushala Municipality Province 2Total Manpower/Months: 4/4Months
Address of the Client: MohattariOverall Cost of the Project: 16,60,535,.00
Name of Associate Consultants (if any): NoneName and position of the senior professional staff of/from the firm involved in the work: Surendra Poudhel Engineer/Team Leader
Details of the work (Project):Finalization of design estimate of the project To carry out Data Analysis and Report Preparation for concerned field visits; Detail hydrological study of the project including the study of the river/khola, catchments characteristics, intensity of rainfall, etc. Compiling, tabulation an interpretation of the hydrological data Conduct meeting with the local people and suggest to client the local needs and demand.
Exact Details of Service :Provided the Complete Engineer Service