Name of the Project: Integrated Municipal Development Plan (IMDP)
Country: Nepal Location within Country: NepalWorking Period: April 2018 to September 2018
Name of the Client (Client's references): Gaushala Municipality, Mahottari DistrictTotal Manpower/Months: 4/5Months
Address of the Client: Mahottari DistrictOverall Cost of the Project: 19,00,000.00
Name of Associate Consultants (if any): NoneName and position of the senior professional staff of/from the firm involved in the work: Surendra Poudhel Engineer/Team Leader
Details of the work (Project):Preparation of the topographical maps of the corridor, Accessibility Data Collection and Analysis, Prepare the Indicative Municipality Development Potential Map (IDPM), Prepare the Municipality Inventory Map (MIM) of Urban Road, Main Trails and Bridges, and Major Infrastructure, Road classification and their nomenclature,Conduct meeting with stakeholders and concerned agencies to provide/seek information and to orient them about the municipal case study. Detailed Engineering survey of the alignment and its corridor, Conduct economically feasible pavement type within the study corridor. Design the road detail with pavement types, Prepare working drawings, Prepare cost estimates with analysis of rates, Prepare social data collection and survey, Explore and recommend source of basic road construction materials.
Exact Details of Service :Provided the Complete Engineer Service

Leave a Reply

Your email address will not be published. Required fields are marked *