| Country: Nepal
Location within Country:
Province 2 | Working Period: July 2018 to October 2018 |
| Name of the Client (Client's references):
Gaushala Municipality Province 2 | Total Manpower/Months:
4/4Months |
| Address of the Client: Mohattari | Overall Cost of the Project:
16,60,535,.00 |
| Name of Associate Consultants (if any):
None | Name and position of the senior professional staff of/from the firm involved in the work:
Surendra Poudhel Engineer/Team Leader |
| Details of the work (Project): | Finalization of design estimate of the project
To carry out Data Analysis and Report Preparation for concerned field visits;
Detail hydrological study of the project including the study of the river/khola, catchments characteristics, intensity of rainfall, etc.
Compiling, tabulation an interpretation of the hydrological data
Conduct meeting with the local people and suggest to client the local needs and demand.
|
| Exact Details of Service : | Provided the Complete Engineer Service |