| Country: Nepal
Location within Country:
Province 1 | Working Period: Baisakha to Ashadh 2076
|
| Name of the Client (Client's references):
Ministry of Social Development ,Biratngar | Total Manpower/Months:
4/3Months
|
| Address of the Client: Biratngar | Overall Cost of the Project:
16,53,642,.00
|
| Name of Associate Consultants (if any):
None | Name and position of the senior professional staff of/from the firm involved in the work:
Bhabuk Aryal Engineer/Team Leader |
| Details of the work (Project): | 1. Finalization of design estimate of the project
2. To carry out Data Analysis and Report
3. Preparation for concerned field visits;
4. Compiling, tabulation an interpretation of the hydrological data
5. Conduct meeting with the local people and suggest to client the local needs and demand.
|
| Exact Details of Service : | Provided the Complete Engineer Service
|